Saturday, 6 October 2012

Old waters!

Today (4th Oct) we cruised along our old home waters – the familiar and the known.
We came through the Bollington canal corridor which retains the essence of it's 1850's industry. Both Adelphi Mill and Clarence Mill are being fully utilised by a variety of small business.
 
Emerging from the wooded cut under the grandeur of Clarence Mill, built 1831


Looking back at Clarence Mill with the new(ish) footbridge

Pulling in at Bollington Wharf for a pump out /diesel, it was good to meet our previous neighbours and pass our old mooring berth. We moored here from 2004 to 2011.

Pulling into Bollington Wharf for services
 
Our old mooring
 

 

Adelphi Mill at Bollington, built 1856
 
Effectively this summer, we have been doing the clockwise Cheshire Ring, albeit in two sections. All the years of cruising the Macclesfield Canal, perhaps we have taken it for granted. Having come back this year, with fresh eyes, the canal is full of interest and beauty, both rural and industrial.
 
We cruised through Macclesfield, passing the majestic Hovis Mill built in 1831, now apartments. I've been told this mill also produced the metal baking tins, as well as the flour/ bread and the paper wrappings for their famous loaves?

 
Read more about the Mill, indeed the history of the Macclesfield Canal on the excellent Macclesfield Canal Society website: Macclesfield Canal Society
 
CRT Yard at Swettenham Street Wharf


  Approaching Verdon's Bridge No.41 – the location of a severe landslip some years ago and the subsequent additional supporting abutments

New additional abutments


Looking back at the roving bridge, Foden Bank Bridge No.43


We moored on the Gurnett Aqueduct Visitor Moorings, from where I walked into town to get some supplies from Aldi!

Friday, 5 October 2012

A day of 3 halves – and the Crash!

The weather has cleared and although rather cold in the northerly wind, at least it wasn't raining. We left the marina into the sun and needed sunglasses!

Looking back at the River Tame Aqueduct towards Portland Basin
 
Bridge No.1 – Stanley Lift Bridge – Lower Peak Forest Canal
 
The initial half is the run south to Marple, through some very pleasant, mostly rural woodlands. We last did this run coming back from the Tameside Festival held at just before the basin. My old log book tells me it was in July 2005.
 
Autumn Cruising

The lowish Woodley 167 yards Tunnel
 
The 'not wide enough for two' Hyde Bank 308 yards Tunnel just after the 'Crash'
 
We entered Hyde Bank Tunnel – the Nicholson says may appear OK, but it's not wide enough for 2 boats. I can verify this. Halfway through, a northbound boater entered, we sounded the horn – yet he still came. Slowing to almost a standstill we hit to the sound of steel on steel and broken glass?! The other steerer apologised saying the tunnel notice had said “two way traffic”. An ambiguous description – meaning 'only room for one boat at a time'? Thankfully, we did not both get wedged tight and needing rescuing!!
Our boat suffered no more than scrapes to the blacking. Anxious moments!
So. boaters be-warned! The Hyde Bank Tunnel cannot take 2 boats at once, despite the less than helpful tunnel sign - “two way traffic”.
 
On the way out – can you really fit two boats through this? Specsavers or what?
 
Looking back at the curious Rose Hill Cutting – an opened out tunnel
 
Sitting under the railway – Marple Locks are just through the next bridge
 
The middle half of the day was to work up the Marple flight of 16 locks raising the canal from the Lower Peak Forest some 214ft up to Marple Junction – thus giving each lock about a 13ft depth. The gates are generally heavy though swung well; the bottom gate paddles were really tight and I needed to use our long shank windlass!
We made the flight in about 3h15m.

A sunlit pound, typical of the lower Marple flight
 
A recent slip needing remedial work
 
Lock furniture – for the tow ropes in olden days (and it didn't roll)
 
Top lock showing the sturdy 1807 stone build

 
The final half of the day's cruise was after the southerly turn onto the Macclesfield Canal.
This has been our 'home' canal since we first started boating in 1990, so we know it well.
It was a pleasant reminder of enjoyable times past as we cruised in the late afternoon, towards our overnight mooring at the visitor stretch opposite Lyme View Marina.
A long days cruising by our standards – I reflected on the day over a couple of pints in the excellent Miners Arms – and after our meal was asleep by 9!


 
Turning into the old stop lock at the start of the Macclesfield Canal

Thursday, 4 October 2012

Upwards and very wet!

The Ashton Canal – built 1800, and re-opened in 1974

Again, we delayed our morning's start for the rain to ease and began the 18 locks upwards to Dukenfield Junction just before 10am.
We knew one boat was ahead of us so had to empty the locks that weren't leaking.

Then we passed a boat on it's way down and had the benefit of locks in our favour for a while. Although an important necessity, the tedium of unbolting each paddle delayed things.

Sticky overlays herald the new Canal and River Trust

  Lock 1 of the Ashton Canal – by a left handed worker?

Amazing architecture – Urban Splash


A typical Ashton Canal Lock – No.4

Boaters doing this section will have seen from the various maps (Nicholson; Geo Map) that Bridge 21 is given as very low. We found the two bridges leading into Lock 4 also very low, especially the rail bridge no.7, coming around the curve into Lock 4. It can only be about 6 foot clearance (depending on full water levels) and has metal girder plates jutting down. Thankfully, we were using our smaller exhaust chimney and got through OK.
 
Having arrived at the lock, there was a warning notice on the lock gate warning against opening the lower padles before getting through the bridge! Too late for us and no good for anyone heading into Manchester!
Manchester City Football Ground – previously the Commonwealth Stadium 2002

Chemical Works

An old pair of bottom gates with vegetation (Lock 11) – probably 20 years old?
Also, see typical leaky gates.

A wet steerer passes Bridge No.15 – a swing bridge opened by the photographer

Top of the flight – Lock No.18 – showing the handsome footbridge and paired locks of which only the righthand one is in use


After 7 hours of travelling, we turned south into the Lower Peak Forest Canal and then Chris reversed us into Guy Holding's Portland Basin Marina for an overnight berth (£5).
We shopped and had fish and chips at the nearby Asda and were asleep early, ready for tomorrow!

 










 
 

Tuesday, 2 October 2012

The Rochdale 9 - 1st Oct 12

We delayed setting off early by going for a cheapo breakfast at the nearby YHA. They had sold out and so we came back to the boat for a cooked breakfast. As we set off it belted with rain while taking on a full tank of fresh water and continued for a couple of locks before clearing into a reasonable days locking.

We had no trouble from anybody and the prop stayed free.
Even the 'lonely' characters under the Piccadilly building were OK.

We came up in 4 hours, Chris on the helm and me locking, turning through Piccadilly Basin to the 24 hour secure moorings at the Piccadilly Village.

The start of the Rochdale 9 – locking up – at Dukes 92 Pub
 
Under Deansgate – the tunnel

 
Under Oxford Rd – hemmed in by buildings old and new
 
the (in)famous Canal Street
No towpath – so a ride up the narrows - too early for folk?
 
Plenty of water coming down
 
 
Into the black hole
 
Under Piccadilly
 

Which ways?
 
 
Our secure overnight mooring at Piccadilly Village

Monday, 1 October 2012

Manchester for the weekend – 29/30th Sept


Although we hadn't planned to stop in Manchester, what a great time we've had!
Our mooring was through the railway bridges, on the Staffordshire Arm. It was open with good lighting and surprisingly quiet for the centre of a large city.


Looking into our mooring – Liverpool Road ahead.
There were a number of boats with a Bridgewater Licence, at least 3 seemed to be permanently moored. There were also a few with no discernible Licence.

Looking back to the mainline – under the railway bridges. The Barge Irwell on the left.

On Saturday, we caught the Metro into the city centre for some shopping and R & R. Stopping at Gullivers Pub for a Lees Bitter. Later, I took a walk up the Rochdale Canal as a recce for Monday. The city architecture is varied and a fascinating mix of old canal/railway industrial with modern regeneration.


City Crown Court
 



 

Wilson's Peveril of the Peak. I had a very lovely pint of Everard's Tiger here.
Was told by a local it is a listed building.
 

Around the Giants Basin there is also much of interest.

Two day barges.

Two day barges.
 
A project still in progress at Potato Wharf
 
Curious circular weir for the River Medlock overflow – under the bridge at Giants Basin.
 
On Sunday it rained quite heavily. I took a look around the nearby City Museum of Science and Industry and immediately got fascinated by the Loco Planet, running as a replica of the 1830 George Stephenson 2-2-0 loco – even had a rather wet footplate ride courtesy of the volunteer driver!
That evening, we walked over the newish footbridge to the Wharf Pub to meet with some friends and their friends. An extremely convivial evening with good ale and pub grub!