This
job has been in process for a while so with Christmas arriving, it
was time to just 'get it done'!
The
bedroom corridor is not an easy place to work and it took some
figuring out – and some cutting of the oak floor panels to get it
all to fit.
Using the open radiator edge to start from. Note the drawer fronts
have been taken off
Front hold being used as a workshop!
Floor cut into the drawer recesses – held in place with clothes
pegs!
One drawer front back on
With trim in place - job done!
No comments:
Post a Comment