Tuesday 9 April 2013

Getting the Jobs Done!

With the boat out of the water, there is a window of time to get as much done as possible.

We are waiting for our turn in the workshop queue to have a new welded baseplate tray for the gas locker – a failure in our Survey. Apparently, steel needs to be ordered.

Meantime, with the weather dry (though really cold with no shelter from the east wind), I have been blacking the hull and painting up the tunnel bands on the stern.

Photos of 'work in progress'.

The Woolies Boat Park
Gary the Engineer welds up the pitting




Grinding flush the weld – proper job!


Blacking up the hull – using a brush for maximum coating

 

 

 

 

 